The Twin-Tunnel Project in Mumbai
The MMRDA has proposed the Thane-Borivali twin-tube tunnel to provide a long-lasting solution to the troubles faced in connectivity between Thane and Borivali. The travel from Borivali to Thane and vice-versa results in a detour of 23 km via Ghodbunder Road, [1] _____ the other available option via the Jogeshwari-Vikhroli link road increases the distance to [2] _____ 38 km. These long- distance travels [3] _____, which can extend further as per the dynamics of traffic.
The proposed twin-tube tunnel road will be 11.8 km long, with a 10.25 km tunnel road beneath the Sanjay Gandhi National Park. Each one of the two tunnel roads [4] _____ and will constitute two lanes, with an additional dedicated lane for emergencies. This project will improve the connectivity between Thane and Borivali, resulting in [5] _____ in travel duration and fuel consumption. Also, this unique endeavour will turn out to be the longest tunnel road in Maharashtra, at an estimated cost of about Rs. 16,600 crore.
Jathar, Dnyanesh, and Nachiket Kelkar. “Third Mumbai Being Planned in MMR: Interview with Dr. Sanjay Mukherjee, Metropolitan Commissioner, MMRDA.” The Week, 03 Mar 2024, Mumbai, p. 39.

The travel from Borivali to Thane and vice-versa results in a detour of 23 km via Ghodbunder Road, [1] _____ the other available option via the Jogeshwari-Vikhroli link road increases the distance to [2] _____ 38 km.
The sentence above presents two relative values and situations parallelly. Which of the following options would be most appropriate to fill blank [1]?

  1. A

    as

  2. B

    while

Question 2

+2 marksOne correct option

Read the passage, observe how numbers and figures are presented in it, and answer the given subquestions:
The Twin-Tunnel Project in Mumbai
The MMRDA has proposed the Thane-Borivali twin-tube tunnel to provide a long-lasting solution to the troubles faced in connectivity between Thane and Borivali. The travel from Borivali to Thane and vice-versa results in a detour of 23 km via Ghodbunder Road, [1] _____ the other available option via the Jogeshwari-Vikhroli link road increases the distance to [2] _____ 38 km. These long- distance travels [3] _____, which can extend further as per the dynamics of traffic.
The proposed twin-tube tunnel road will be 11.8 km long, with a 10.25 km tunnel road beneath the Sanjay Gandhi National Park. Each one of the two tunnel roads [4] _____ and will constitute two lanes, with an additional dedicated lane for emergencies. This project will improve the connectivity between Thane and Borivali, resulting in [5] _____ in travel duration and fuel consumption. Also, this unique endeavour will turn out to be the longest tunnel road in Maharashtra, at an estimated cost of about Rs. 16,600 crore.
Jathar, Dnyanesh, and Nachiket Kelkar. “Third Mumbai Being Planned in MMR: Interview with Dr. Sanjay Mukherjee, Metropolitan Commissioner, MMRDA.” The Week, 03 Mar 2024, Mumbai, p. 39.

The travel from Borivali to Thane and vice-versa results in a detour of 23 km via Ghodbunder Road, [1] _____ the other available option via the Jogeshwari-Vikhroli link road increases the distance to [2] _____ 38 km.
The sentence above provides an estimate of a value in blank [2]. Which of the following would be most appropriate to the context?

  1. A

    About

  2. B

    Exactly

Question 3

+2 marksOne correct option

Read the passage, observe how numbers and figures are presented in it, and answer the given subquestions:
The Twin-Tunnel Project in Mumbai
The MMRDA has proposed the Thane-Borivali twin-tube tunnel to provide a long-lasting solution to the troubles faced in connectivity between Thane and Borivali. The travel from Borivali to Thane and vice-versa results in a detour of 23 km via Ghodbunder Road, [1] _____ the other available option via the Jogeshwari-Vikhroli link road increases the distance to [2] _____ 38 km. These long- distance travels [3] _____, which can extend further as per the dynamics of traffic.
The proposed twin-tube tunnel road will be 11.8 km long, with a 10.25 km tunnel road beneath the Sanjay Gandhi National Park. Each one of the two tunnel roads [4] _____ and will constitute two lanes, with an additional dedicated lane for emergencies. This project will improve the connectivity between Thane and Borivali, resulting in [5] _____ in travel duration and fuel consumption. Also, this unique endeavour will turn out to be the longest tunnel road in Maharashtra, at an estimated cost of about Rs. 16,600 crore.
Jathar, Dnyanesh, and Nachiket Kelkar. “Third Mumbai Being Planned in MMR: Interview with Dr. Sanjay Mukherjee, Metropolitan Commissioner, MMRDA.” The Week, 03 Mar 2024, Mumbai, p. 39.

Fill in the blank with the most appropriate option
These long-distance travels [3] _____, which can extend further as per the dynamics of traffic.

  1. A

    involve one and a half hours of commute

  2. B

    will have an outer diameter of 13.05 m

37 more questions in this paper

Sign in with Google — it is free — to see every question with its answer and explanation, practise it in learning mode, or take it as a timed mock test.

More on the English 2 Quiz 2 23 Nov 2025 paper

The IIT Madras BS English II (English 2) Quiz 2 paper sat on 23 Nov 2025, in the September 2025 term: 40 questions for 50 marks in 120 minutes. The first 3 questions are below. Sign in with Google — it is free — to see the whole paper with its answers and explanations, in learning mode or as a timed mock test.

FeatureEnglish 2 Quiz 2 23 Nov 2025 at a glance
TermSeptember 2025 term
SubjectEnglish II
Course codeBSHS1002
Questions40
Marks50
Duration120 min
MCQ40
Official paperIIT M DIPLOMA AN EXAM QDD2 23 Nov 2025 NEW
Negative markingNo negative marking.
Updated

Same Quiz 2, other subjects

More English 2